
Patch Manager 13-25
With Oracle E-Business Suite Release 12.2 the adop patching process required two
deployment procedures. The first deployment procedure runs the prepare, apply,
finalize, and potentially actualize_all phases. The second deployment procedure
executes cutover, cleanup, and potentially fs_clone.
On the options page you determine when each of these deployment procedures are
executed. The first deployment procedure (that runs adop prepare, apply, finalize,
and possibly actualize_all) can be started immediately upon submission or
scheduled. If the "Schedule" option is selected, a date field is dynamically
displayed. The grace period is the amount of time Enterprise Manager should wait
if the Enterprise Manager job system cannot start the deployment procedure at the
intended time.
Specify details for how the patch should be applied.
Patch Application Deployment Procedure
Specify the Start Options:
• Start Immediately
Comentários a estes Manuais